Converting Existing Buildings into Embedded Networks

Converting Existing Buildings into Embedded Networks

AU Energy Compliance
Today we are looking at the 'retrofit process' for embedded networks. We focus on the eastern states, other than Victoria - which has its own regulatory framework. Under the National Electricity Rules (NER), any party that engages in an electricity transmission or distribution activity must either be registered with the Australian Energy Market Operator (AEMO) as a network service provider (NSP) or operate under an exemption. If that same entity sells electricity then it will also require either a retail exemption or a retail authorisation. We've discussed that distinction in more detail here. A retrofit involves an Embedded Network Operator (ENO) converting an existing building (with separately metered sites) into an embedded network. This results in the building having a single connection point where electricity is purchased in bulk and…